The client provided an architectural plan and requested a tubing layout along with a schematic piping diagram. We strongly recommended that the client used our full design services—including tubing layout design, heat‑loss calculation, equipment sizing, and control consultation—because all of these elements are integrated.

Part of the tubing had already been installed under the basement floor by the installer, so we needed to copy and redraw the tubing layout in LoopCAD—including the number of supply and return loops and the spacing—in order to achieve optimal heat‑loss calculation results. The thermostats, zone control board, and buffer tank had already been sourced. The distribution system—including the pump stations and manifolds—was supplied by Solarnetix.